So Im only about 2 months late in getting my Flail hammer mill up and running but it will be assembled as soon as the paint drys and given a long test over the next couple of weekends. Its the small details that seem to take the most time. If I ever build another one I will beg buy or borrow a mig as stick welding just takes so long to get right especially when the cheap arse ******* electrodes keep throwing slag into the welds.
Anyway heres a couple of pics
It would be a couple of pics if I could stop the second image from tipping on its side.
Anyway heres a couple of pics
It would be a couple of pics if I could stop the second image from tipping on its side.