Philthy
Phill
This is a project that I have been working on for a couple of weeks during those small downtime periods at work.
Once again, most of the materials came from the shop with the big red hammer and this one owes me a little over $30.
Some Gal sheet, Aluminium floor strip, 4 way hose connector. Also needed some ribbed rubber and some aluminium offcuts from work.
My gold catchment placing.
Once again, most of the materials came from the shop with the big red hammer and this one owes me a little over $30.

Some Gal sheet, Aluminium floor strip, 4 way hose connector. Also needed some ribbed rubber and some aluminium offcuts from work.

My gold catchment placing.