Huntsmahon said:I've roughly knocked together a walbanker slightly skinnier and shorter as it's out of off cuts, to use at slaty creek this weekend. It's a bit rough around the edges as the one I had made neatly hasn't been welded yet. I haven't been able to find another bit of expanded metal for the boiler section any ideas on what else I could do to get me out of trouble? Cheers Pat
nucopia said:i have decided to replace my walbanker legs as the ones I had, were not strong enough to sustain the work load.
Replaced the cross section supports with with alluminum box 1x 4 and have drill the holes to take the PVC pipe.
Now i need to find alluminium pipe to weld into the cut holes to receive the PVC .. Its proving to be hard to find the right size pipe to do the job does any one have any ideas what I can use to brace the PVC pipe into to cut outs temporarily, so I can still use the legs on the banker with out the pipe ?
Enter your email address to join: