I would say so Cobber.
I could not imagine them setting the pylon foundations in rubble owing
to the amount of water going through it.
.
Ok, Lets say 15 meters high from the bed of the river to the deck then. LOL
That's in the part of the river that always is flowing.
I could not imagine them setting the pylon foundations in rubble owing
to the amount of water going through it.
.
Ok, Lets say 15 meters high from the bed of the river to the deck then. LOL
That's in the part of the river that always is flowing.