TenOunce Tone
tony
Well I started work on a sluice last year. It was pretty sad looking. Here is a pic...
The frame was holding the mesh in and it would fall out all the time. Soo i never used it..
Had some time this arvo so took the time to create this.
The plan is to eventually fit some kind of hopper to the top. Plumbing for pump or mandraulic pump to mahe a rocker box come hibanker
The sluice is about 550 - 600 long with a 300 slicker plat. The hopper as stands is about 450 long with some rubber matting. The mesh is aluminium off cut. The angle is 30deg. I think the props will fail but its temporary. Hope to be able to set it in a creek and shovel direct onto it.. oneday

The frame was holding the mesh in and it would fall out all the time. Soo i never used it..
Had some time this arvo so took the time to create this.
The plan is to eventually fit some kind of hopper to the top. Plumbing for pump or mandraulic pump to mahe a rocker box come hibanker
The sluice is about 550 - 600 long with a 300 slicker plat. The hopper as stands is about 450 long with some rubber matting. The mesh is aluminium off cut. The angle is 30deg. I think the props will fail but its temporary. Hope to be able to set it in a creek and shovel direct onto it.. oneday


