How many excavators??

Prospecting Australia

Help Support Prospecting Australia:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Not bad that they have everything at their fingertips.... There's no way that will ever be done here... We don't manufacture here anymore...

LW...
 
Made me through up that's our 240 year initiative better roads project at 240 billion with roundabouts.
 
There like Ants, the blokes over here if they were any slower they'd Rust,

I just love it when they close off 10m /16ks of highway 2 lanes of a 3 lane wide and there is no bugger working and they cut the speed limit from 120ks down to 50kph, Oh the joy of driving in 3rd gear when I got 6 to play with :mad: :mad: :mad:

LOL.
 
LoneWolf said:
Not bad that they have everything at their fingertips.... There's no way that will ever be done here... We don't manufacture here anymore...

LW...

Thats a project i worked on in Brisbane , they built 19,000 tonne tunnel sections and pushed them underneath an active rail line with hydraulic strand jacks.

https://www.youtube.com/watch?v=XxGun9lTdZY

This is just one of the hydraulic strand jacks

https://www.youtube.com/watch?v=XxGun9lTdZY

We do build some big **** here now and then.
 
BigWave said:
Cool!
They do this in 24hrs and build 2 intensive care hospitals in 10 days.
I think they've a lot to teach us!

We could do it too except for the Council permits and approvals.

The actual construction is a piece of p1ss , if you watch the videos closely you can see the hospital is made of 20 foot container modules.

The base and roof panels are the same , they just insert 4 posts with locking tabs in to the floor and roof , use tesa double sided tape to fasten 90 mm thick insulated sandwich panels for the walls and you have a 6 metre long by 2.4 metre wide modular room.

Place them all on top of steel 500 UB beams and you have a crawl space underneath to run water , sewer , medical gas and electrical services , rinse and repeat 2000 times and you have a hospital building.

Difference between China and us is that we would spend $ 200 million on project consultants , then pick the worst advice and go with that.
 
1584736823_img_0785.jpg


One of these will shift a bit of dirt as well
 

Latest posts

Top