Hi All,
I am building my first Recirculating Sluice its about 20 cm wide and 70 cm long, I am using Vmat then Miners Moss then expanded mesh. All these materials put together is about 2 cm thick , should I have my water flow hitting that edge then up the 2 cm rise and if so should I put a small riffle in front ? or should I have my water running flat over the top of the expanded mesh... Hope you understand what I am asking its a bit hard to explain
James
I am building my first Recirculating Sluice its about 20 cm wide and 70 cm long, I am using Vmat then Miners Moss then expanded mesh. All these materials put together is about 2 cm thick , should I have my water flow hitting that edge then up the 2 cm rise and if so should I put a small riffle in front ? or should I have my water running flat over the top of the expanded mesh... Hope you understand what I am asking its a bit hard to explain
James