thanks wal /liz this is my build of your walbanker ready for a test run I had a great time in the shed building it
Terry said:hi wal thanks mate I will post a pic iam waiting for a mate to bring the cat walk mesh up here may be today or tomorrow its built to your spec I hope 450mm in the catch section,then maybe 70mm then the mesh section at 170 mm do I need that 70 mm extra or extend the mesh
cheers wal
WalnLiz said:Terry said:hi wal thanks mate I will post a pic iam waiting for a mate to bring the cat walk mesh up here may be today or tomorrow its built to your spec I hope 450mm in the catch section,then maybe 70mm then the mesh section at 170 mm do I need that 70 mm extra or extend the mesh
cheers wal
The Boiler section above the crate is the critical section as this is where 95% of the gold will catch. 500mm is the minimum slick plate i would recommend, and the Crate section is where i would shorten if you don't have the 500mm. Many areas I run 2/3rd mesh and 1/3rd crate. Depends on how much flour gold is in your area.
Cheers Wal.