Decided to do a little more to this . Had the engine running but found that I needed to put it on rubber mounts . $12 for 4 from E-bay . Also need to beef the frame up . Drilled holes 10 m.m. on the ends so that I can weld 2 bars in to make it more rigid . The legs can still be removed but as a pair . Also made 4 braces out of 32x3 m.m. flat that will bolt on front and back . When I get it done I will put up a photo .
Thought I would put up another photo or two . Not much work been done on it in the last few months .
The handle and wheels will only be used to move from one spot to another . The legs slot and bolt onto the main frame , might need some cross bracing but I want to keep it clear under the drum to get plastic buckets in .
I have put a small flywheel on , it was sitting under the bench doing nothing .
yes Mike, I've been using my impact mill a bit used it again a few days ago and knocked a bit of gold out of some quartzDecided to do a little more to this . Had the engine running but found that I needed to put it on rubber mounts . $12 for 4 from E-bay . Also need to beef the frame up . Drilled holes 10 m.m. on the ends so that I can weld 2 bars in to make it more rigid . The legs can still be removed but as a pair . Also made 4 braces out of 32x3 m.m. flat that will bolt on front and back . When I get it done I will put up a photo .
Enter your email address to join: