TenOunce Tone
tony
Well its time to step it up a notch..
Bought some aluminium sheet 1300 x 440 and some other of cuts for a about $20.00 had the sheet cut into two pieces and folded.. one length is at 550 the other is at 750, the 550 has a 235 tray, the 750 has a 240 tray.. one will fold into the other for future highbanker or as a small sluice..
Found a few bits and pieces laying around the garage and took the grinder to them and come up with the following..
From left to right there is about 200 of slicker plate, then 100 of 3mm mesh as a riser plate then about 200 of walkway then about 300 of low profile expanded mesh (3 - 4 mm in height about 10mm hole.
My Dilema, do i replace the riser plate with some smooth sheet?
Do i get rid of the 3mm mesh under the walkway?
Do I get rid of the walkway and use the low profile mesh?
I have "Bunnings Blue Miners Moss" under the mesh area.
I will be using some 20x 20 angle to hold the bits in place..
Any pointers?
Detail pics
I hope to have this operational tomorrow..
Regards, Tone
Bought some aluminium sheet 1300 x 440 and some other of cuts for a about $20.00 had the sheet cut into two pieces and folded.. one length is at 550 the other is at 750, the 550 has a 235 tray, the 750 has a 240 tray.. one will fold into the other for future highbanker or as a small sluice..
Found a few bits and pieces laying around the garage and took the grinder to them and come up with the following..

From left to right there is about 200 of slicker plate, then 100 of 3mm mesh as a riser plate then about 200 of walkway then about 300 of low profile expanded mesh (3 - 4 mm in height about 10mm hole.
My Dilema, do i replace the riser plate with some smooth sheet?
Do i get rid of the 3mm mesh under the walkway?
Do I get rid of the walkway and use the low profile mesh?
I have "Bunnings Blue Miners Moss" under the mesh area.
I will be using some 20x 20 angle to hold the bits in place..
Any pointers?
Detail pics


I hope to have this operational tomorrow..
Regards, Tone