Evening
Got to do a bit over last two days.
Had back of bellows sheet metal rolled and installed them and then installed bellows wood. Is a nice fit so not much air should escape, should be good. Installed riffle tray deck and have finished parts for riffle trays, 196 x 25mm holes (needed a beer after that) so will soon put them all together.
Also installed feed slides so ready to work out hopper.
Got to do a bit over last two days.
Had back of bellows sheet metal rolled and installed them and then installed bellows wood. Is a nice fit so not much air should escape, should be good. Installed riffle tray deck and have finished parts for riffle trays, 196 x 25mm holes (needed a beer after that) so will soon put them all together.
Also installed feed slides so ready to work out hopper.
Last edited: