Today I added a detachable highbanker setup to my bunnings sluice, it becomes a washout wand in 5 seconds.
At his stage I intend to work high and dry crevices, classify down to 6mm and lug dirt to the creek for processing, but have a few ideas floating around in my head for a detachable grizzly and recirculating bucket.
At his stage I intend to work high and dry crevices, classify down to 6mm and lug dirt to the creek for processing, but have a few ideas floating around in my head for a detachable grizzly and recirculating bucket.
