Back Outback..

Prospecting Australia

Help Support Prospecting Australia:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

20x

scott
Joined
Mar 5, 2014
Messages
2,322
Reaction score
7,392
Location
Ballarat
First sunset..
1623830048_img_20210616_173608_compress26.jpg
 
Would never underestimate your ability to dig a hole mate, be watching with interest :Y:
 
20xwater said:
Mackka said:
Level bottom :lol: :lol: :lol: :lol: :lol:
There is a good reason, you will see why :cool:

From the 1st picture in post #9 are you building a thunder box with concealed water storage/ waste ventilation system :|

Nice work what ever it is :Y:
 
2.1 X 1.1 X 0.6 = 1.38 cube
3.5 hrs on my own..

Going by your calculations, you should reach the 18' level in 2365 days.. .. :playful:

But I do know how to speed that up... I think 20x knows how to as well... ;)

LW....
 
20xwater said:
New mine from scratch..
This one drill hole..
https://www.prospectingaustralia.co...623887495_img_20210617_0923212_compress36.jpg
Was meant to be for this thunder box..
https://www.prospectingaustralia.co...623887567_img_20210617_0922452_compress16.jpg
And just so happen to bring up some potchy trace somewhere between about 16 and 18 feet.
Setup and ready to dig out for the collar..
https://www.prospectingaustralia.co...623887847_img_20210617_0945062_compress28.jpg
Down we go..

I think you mean cellar
 
Yes it is a shaft, tipper rail goes down one of the short sides, ladder goes the other end.
Just gotta hope the trace is in the wall of one of the long sides coz that's what ya drive off.
I've dug another hole for the thunder box manually just for now.
 

Latest posts

Top