Now this is a Highbanker

Prospecting Australia

Help Support Prospecting Australia:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Nice one man operation setup. This is what the Hoffmans needed in the jungle
 
geez backcreek . yours is better than their one

funny they spent $ 400,000 on the excavator but only $ 1000 on the process plant

i reckon 10 % losses before the wash even gets to the sluice

and they probably miss 30 % of the gold bearing ore coz they are dumping tailings back on top of it

------

this is relocatable , they can dig down and feed straight into the feed hopper , the tailings fall straight back in the same hole and the excavator keeps working forwards and drags the plant with it

they only process the gravels once that way

[video=480,360]http://www.youtube.com/watch?v=sQWdfywKXCc[/video]

check out Page 7 , Fig 8

http://www.mine.mn/WPJ2_3_36-49_NZ_mobile_mining.pdf
 

Latest posts

Top